• (65) Toronto Mid-Rise: What’s Changed and What Still Holds Projects Back? - Claire Malcolmson
    Nov 12 2026

    Send us Fan Mail

    Where does the garbage truck go? On a tight Toronto mid-rise site, the answer can change the ground-floor layout and how many homes you can build.

    In episode 65 of Real Estate Development Insights, I sit down with Claire Malcolmson of the Mid-Rise Advocacy Group to revisit The Mid-Rise Manual. I’m also part of the group, and I wanted to look at Toronto’s progress from a developer’s perspective. What can you put in the pro forma today, and which proposed changes could affect the deal if they move forward?

    We discuss:
    - How as-of-right zoning can reduce rezoning risk and why site-specific exceptions still matter.
    - How upper-storey stepbacks can affect construction details and long-term maintenance.
    - Why loading, waste collection, bicycle parking, and electrical servicing belong on the concept plan early.
    - What to verify before assuming a shorter site plan review or a different servicing approach in your budget and schedule.
    Resources
    - The Mid-Rise Manual
    - City of Toronto Mid-Rise Housing Implementation Initiative
    - City of Toronto Avenues Policy Review
    If you control a GTA mid-rise site and want to test the layout, budget, and delivery plan before locking in the design, reach out with the address and your current project stage. Solnik Construction Group

    #TorontoMidRise #RealEstateDevelopment #MissingMiddleHousing

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    33 min
  • (64) From Architect to Multiplex Developer: Lessons from the Site​ - Noam Hazan
    Oct 27 2026

    Send us Fan Mail

    What changes when the architect becomes the developer—and takes responsibility for getting the project built?

    In this episode, Payam Noursalehi speaks with Noam Hazan, architect and founder of Noam Hazan Design Studio in Toronto. After designing multiplexes for clients, Noam is developing a fourplex and garden suite of his own, taking on the roles of co-owner, architect and general contractor.

    Noam shares what the experience has taught him about selecting a site, hiring trades, managing construction and deciding where to save—and where spending more may be worthwhile. He reflects on a foundation contractor decision he regrets, the demands of managing the site alongside his architectural practice, and what he would approach differently on his next project.

    In this conversation:

    • Moving from designing multiplexes to developing your own.
    • Why Noam chose to act as general contractor—and what he would delegate next time.
    • Site-selection considerations, including trees, easements, existing tenants and setbacks.
    • How a lower foundation bid led to delays and winter construction challenges.
    • Bringing construction lessons back into architectural drawings and coordination.
    • Investing in acoustics with the future tenant experience in mind.
    • Noam’s perspective on development charges and the alternative-solutions approval process.

    At the time of recording, Noam’s project was approaching completion. The discussion reflects his experience to that stage, rather than final construction costs or stabilized operating results.

    About Noam Hazan

    Noam Hazan is an OAA-licensed architect, developer and founder of Noam Hazan Design Studio. His Toronto practice focuses on multiplexes, missing-middle housing and custom residential projects. His work as both architect and developer connects design quality with feasibility, construction coordination and the practical responsibilities of ownership.

    Planning a multiplex or small mid-rise project?

    Solnik Construction Group helps GTA developers plan and deliver projects through development advisory, preconstruction and construction management.

    Learn more at SolnikConstruction.com

    Subscribe to Real Estate Development Insights and share this episode with someone considering their own development.

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    39 min
  • (63) Building Small Mid-Rise in Toronto: What Developers Need to Know - Heather Dubbeldam & Derek McCallum
    Oct 7 2026

    Send us Fan Mail

    What should you investigate before turning a Toronto major-street property into a small mid-rise apartment project?

    Heather Dubbeldam and Derek McCallum of Dubbeldam Architecture + Design join Payam Noursalehi to discuss what they are learning from small apartment projects moving through design and approvals across Toronto.

    The conversation explores how parking, retail space, building height, technical variances, municipal reviews and Hydro servicing interact—and why those details deserve attention early in the project.

    We also consider the question facing many property owners: should you pursue a multiplex or explore a larger small-mid-rise scheme? Heather and Derek discuss the importance of the owner’s holding horizon, the intended residents and the team guiding the project.

    In this episode:

    • Why neighbourhood services matter when designing housing with limited parking.
    • How commercial ground-floor heights can put pressure on the rest of the building.
    • The trade-offs behind a proposed four-space underground garage in a 43-unit scheme.
    • How technical variances and legacy zoning exceptions can complicate an approvals path.
    • Why waste collection, servicing and the site plan need coordinated attention.
    • The challenge of accommodating electrical infrastructure on a narrow lot.
    • What to consider when comparing a multiplex with a small apartment building.
    • The guests’ vision for outdoor amenity space and complete communities.

    Working on a GTA project? Contact Solnik Construction Group with your site, current stage and main delivery concern. We help owners stress-test, plan and deliver multiplex and small-mid-rise projects through development advisory, preconstruction and construction management. Learn more at SolnikConstruction.Com

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    1 ora e 5 min
  • (62) Toronto Housing Approvals: What’s Changing - Jag Sharma - Deputy City Manager - City of Toronto
    Sep 22 2026

    Send us Fan Mail

    What is changing inside Toronto’s housing approval system—and what will developers actually notice?

    Jag Sharma, Deputy City Manager for Development and Growth Services at the City of Toronto, joins Payam Noursalehi to discuss development review, site plan changes, coordination with utilities, and the effort to move housing projects toward occupancy.

    The conversation connects City Hall’s reform agenda to the practical concerns of small and mid-sized developers: inconsistent comments, late surprises, connection delays, financing constraints and the risks of taking on a first project.

    In this episode:

    • Why Jag wants industry feedback to determine whether process changes are working.
    • The reasoning behind different site plan review streams and associated fees.
    • How some engineering reviewers connect Development Review with Toronto Water.
    • Why cooperation with utilities matters even where the City does not control their decisions.
    • The distinction Jag draws between development-charge relief and purpose-built rental incentives.
    • His outlook for multiplexes, mid-rise housing and modern methods of construction.
    • Why Payam believes new development opportunities need to be accompanied by education and practical preparation.

    Jag’s point about measuring the journey to occupancy runs through the discussion. For developers, the useful question is what still stands between the current application and a building people can use.

    Listen to the full conversation with Jag Sharma on Real Estate Development Insights.

    This discussion includes proposed changes, forecasts and programs whose details may evolve. Check current City documents and obtain project-specific professional advice before relying on timelines, incentives or eligibility assumptions.

    Resources

    • Toronto development charges information
    • Council decision addressing DC reductions and Phase 2 rental incentives
    • August 5, 2026 federal–Toronto rental housing announcement

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    47 min
  • (61) Should You Build a Multiplex? 5 Checks Before You Commit
    Sep 9 2026
    Send us Fan MailShould You Build a Toronto Multiplex? Five Questions to Answer FirstI run a construction company, so it may be against my own interest to say this: not every multiplex project should be built.Toronto’s planning environment has created new opportunities to build fourplexes, sixplexes, garden suites and other forms of small-scale housing. But permission to build more units does not automatically make a property financially feasible.A zoning permission is an opportunity to investigate. It is not a business case.In this episode of Real Estate Development Insights, I share five questions that property owners, investors and first-time developers should answer before committing significant time and capital to a Toronto multiplex project.These questions came out of our Toronto Multiplex Feasibility Workshop, where we built a pro forma for a representative multiplex and then tried to break it. We tested the assumptions behind the design, rental income, construction costs, financing, equity requirements and potential downside.If you can answer all five questions using credible information, you may have a viable project. If you cannot answer one or two of them, you may still have an interesting idea—but you do not have a project yet.That is much less expensive to discover before construction begins.The Five Multiplex Feasibility Questions1. What are you actually trying to accomplish?Before evaluating the property, define what a successful outcome means for you.Are you planning to build and sell, hold the property as a long-term rental, refinance after stabilization, live in one unit or create a multigenerational family property?Building, owning and operating a building require different skills, capital structures and definitions of success. Your intended outcome should guide the design, financing and development strategy.You should also establish your walk-away conditions before becoming emotionally or financially attached to the property.2. What can actually be built—and does it create the right product?The maximum permitted unit count is not necessarily the best development program.A viable multiplex must be capable of being designed, approved, serviced, constructed, rented or sold, and operated efficiently on the specific property.Site dimensions, setbacks, trees, access, grading, utilities, fire protection, building-code requirements and approval risks can all affect what is realistically achievable.Design efficiency matters as well. You may pay to construct 6,000 square feet but only generate revenue from 5,000 square feet. Adding units can also mean adding kitchens, bathrooms, entrances, fire separations, equipment and circulation space.Maximizing unit count is not always the same as maximizing value.3. Who will pay for the product—and can you defend the revenue?Revenue assumptions can make almost any multiplex pro forma look attractive.The question is whether the projected rents or sale prices are supported by the actual neighbourhood, unit sizes, layouts, finishes, parking, storage, natural light, utility arrangements and competing supply.Small rental buildings also carry concentrated vacancy risk. In a four-unit multiplex, one vacant unit represents 25% of the potential unit revenue during that period.A landlord must effectively resell each unit every month by continuing to provide a home that tenants consider worth paying for. Design quality, sound separation, durability, maintenance and tenant experience all affect vacancy, turnover and long-term property value.Do not begin with the rent required to make the project work and then search for evidence to support it. Establish a defensible revenue range first and let the pro forma tell you whether the project is feasible.4. What will the multiplex really cost—and when will the money be required?Construction cost is not the same as total development cost.A complete multiplex budget may also include acquisition and closing costs, design and engineering, surveys, due diligence, municipal applications, permits, demolition, site work, utility upgrades, insurance, legal and accounting fees, financing costs, property taxes, carrying costs, leasing expenses and contingency.Be especially careful with construction costs quoted per square foot. Always ask:Per square foot of what?What is included in the number?How developed was the design when the estimate was prepared?How much uncertainty remains?A cost without a clear definition is not a useful benchmark.Contingency should also be treated separately from profit. If a project only meets its target return after removing a reasonable contingency, it does not truly meet the target return.5. Can you finance the project, survive the downside and justify the exposure?A profitable-looking multiplex can still fail because it requires more equity, guarantees or financial exposure than the owner can reasonably accept.One of the most important outputs of a multiplex pro forma is peak equity: the ...
    Mostra di più Mostra meno
    41 min
  • (60) Toronto’s 2026 Housing Incentives: What Developers Need to Recalculate
    Aug 6 2026

    Send us Fan Mail

    Toronto has announced residential development-charge reductions of 40% to 60%, backed by $1.5 billion in funding. But the commercial question is not simply how large the headline discount is—it is which projects qualify, how unit type changes the benefit, and whether the new rates materially improve feasibility. In this episode, Payam Noursalehi reviews the permit milestones, the implications for multiplex and apartment projects, the separate purpose-built rental incentive stream, and the questions owners should test before changing a project strategy. Program rules and dates may evolve; review the current City of Toronto materials for project-specific decisions.

    #TorontoHousing #DevelopmentCharges #RealEstateDevelopment #MultiplexDevelopment #PurposeBuiltRental

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    27 min
  • (59) CMHC Financing for Small Mid-Rise Projects - Abtin Nikeghbali - Canada ICI
    Jul 14 2026

    Send us Fan Mail

    CMHC MLI Select may offer compelling financing terms for purpose-built rental development—but “up to 95% loan-to-cost” does not mean every project will receive 95%, or that a developer needs only 5% cash.

    In this episode, Payam Noursalehi speaks with Abtin Nikeghbali of Canada ICI about what lenders and CMHC examine when evaluating a small Toronto mid-rise or multi-unit rental project.

    The conversation covers:

    • Net-worth and liquidity expectations
    • Construction and property-management experience
    • How lenders assess rents, vacancy and operating assumptions
    • The difference between maximum leverage and actual proceeds
    • Why owners must front construction costs before receiving draws
    • Builder contracts, bonding and third-party management
    • CMHC construction financing versus completion takeout
    • When a developer should begin the financing process
    • How Major Streets and EHON projects may fit into the rental-financing landscape

    The rates, timelines and program interpretations discussed reflect the conversation at the time of recording. CMHC policies and financing terms can change. Obtain current advice from qualified lending, legal, accounting, appraisal and construction professionals before making a project decision.

    #RealEstateDevelopment #CMHC #PurposeBuiltRental #DevelopmentFinancing #TorontoRealEstate

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    40 min
  • (58) Development Charges Explained: The Growth Cost No One Can Ignore
    Jun 30 2026

    Send us Fan Mail

    Development Charges Explained: Why They Rose, What Went Wrong, and What DC Relief Means for Housing

    In this episode, Payam discusses development charges (DCs) as one-time fees on new developments intended to fund growth-related municipal infrastructure such as roads, transit, water, parks, libraries, and emergency services, noting the costs are often passed through to end users. He argues DCs became unsustainably front-loaded as market conditions worsened, using the “beer distribution game” to explain how reasonable decisions across the system can create unreasonable outcomes due to timing lags between long-term infrastructure planning and upfront project financing. He outlines reasons DCs rose—larger capital programs, higher land and construction costs, bylaw changes, and annual indexing—and highlights Toronto’s unique transit-heavy DC structure, with about 60% directed to mobility. He cites Toronto DCs rising from about $11,700 in 2010 to over $137,000 in 2024, indexing paused for 2025–26, Bill 23 exemptions, and a 2026 federal-provincial program incentivizing 30–50%+ reductions; Toronto plans 40–60% cuts (2026–29) supported by $1.5B. He says reductions help viability (CMHC estimates ~5% viability lift at 50–60%) but won’t be a silver bullet, and raises concerns about replacing lost municipal funding and the need for broader, less DC-reliant infrastructure financing.

    • Development Charges Explained
    • Who Really Pays DCs
    • Beer Game Analogy
    • Timing Mismatch Problem
    • Why DCs Skyrocketed
    • Toronto Transit Factor
    • Numbers and Indexing
    • Legislative Changes and Relief
    • Will DC Cuts Restart Housing
    • Municipal Pushback
    • Better Funding Alternatives

    For more information, please refer to RealEstateDevelopmentInsights.com

    Join Our Workshop: MultiplexWorkshop.com



    Mostra di più Mostra meno
    29 min