(65) Toronto Mid-Rise: What’s Changed and What Still Holds Projects Back? - Claire Malcolmson
Impossibile aggiungere al carrello
Rimozione dalla Lista desideri non riuscita.
Non è stato possibile aggiungere il titolo alla Libreria
Non è stato possibile seguire il Podcast
Esecuzione del comando Non seguire più non riuscita
-
Letto da:
-
Di:
Send us Fan Mail
Where does the garbage truck go? On a tight Toronto mid-rise site, the answer can change the ground-floor layout and how many homes you can build.
In episode 65 of Real Estate Development Insights, I sit down with Claire Malcolmson of the Mid-Rise Advocacy Group to revisit The Mid-Rise Manual. I’m also part of the group, and I wanted to look at Toronto’s progress from a developer’s perspective. What can you put in the pro forma today, and which proposed changes could affect the deal if they move forward?
We discuss:
- How as-of-right zoning can reduce rezoning risk and why site-specific exceptions still matter.
- How upper-storey stepbacks can affect construction details and long-term maintenance.
- Why loading, waste collection, bicycle parking, and electrical servicing belong on the concept plan early.
- What to verify before assuming a shorter site plan review or a different servicing approach in your budget and schedule.
Resources
- The Mid-Rise Manual
- City of Toronto Mid-Rise Housing Implementation Initiative
- City of Toronto Avenues Policy Review
If you control a GTA mid-rise site and want to test the layout, budget, and delivery plan before locking in the design, reach out with the address and your current project stage. Solnik Construction Group
#TorontoMidRise #RealEstateDevelopment #MissingMiddleHousing
For more information, please refer to RealEstateDevelopmentInsights.com
Join Our Workshop: MultiplexWorkshop.com