The Forgotten Memo That Predicted a Campus Flood Twice
Impossibile aggiungere al carrello
Puoi avere soltanto 50 titoli nel carrello per il checkout.
Riprova più tardi
Riprova più tardi
Rimozione dalla Lista desideri non riuscita.
Riprova più tardi
Non è stato possibile aggiungere il titolo alla Libreria
Per favore riprova
Non è stato possibile seguire il Podcast
Per favore riprova
Esecuzione del comando Non seguire più non riuscita
-
Letto da:
-
Di:
Flooding that mirrored a forgotten memo unfolded on campus four days after the memo's date - and the same warning had been written twice, eighteen years apart. The discovery began when a hand truck wheel snagged an unlabeled box in Crestfield University's sub-basement and revealed a single typed document describing, in precise technical terms, the exact flood Gregory Harris saw that morning; how did two independent records point to the same failure?
In this episode, we follow the sequence of verifiable events: the box found in the Harwick Archive sub-basement, the April 5 memo matching an April 8 pipe burst, and the fact that an earlier analyst had produced the same warning eighteen years before. How did two people, working separately from the same buried data, arrive at identical conclusions?
Person: Gregory Harris
Person: Heather Sheridan
Location: Harwick Archive sub-basement, Crestfield University campus
Date: April 5 (document date) and April 8 (pipe burst)
Event: Cast-iron pipe burst at Ardmore and Ninth, flooding toward the botany greenhouse
- Gregory Harris found an unlabeled gray banker's box flush against the concrete floor in the sub-basement while handling donated hymnals.
- The single typed document in a manila folder described standing water at a flooded intersection and flow toward the botany greenhouse; its date was April 5.
- The cast-iron pipe at Ardmore and Ninth burst on April 8, four days after the memo's date.
- Heather Sheridan logged thirty-nine keycard entries in the sub-basement access log over fourteen months and had been working on Ardmore and Ninth since early March 2014.
- Heather's March 22 notebook and March 27 draft on the university server described the same failure mode and estimated failure within two to three weeks prior to the April 8 burst.
To listen to this podcast ad-free and access premium episodes, try our subscription with a 14-day free trial at obomedia.com.
© 2026 OBOMEDIA. All rights reserved.
This episode and its content (audio, text, and related materials) are the exclusive property of OBOMEDIA and are protected by applicable copyright laws. Reproduction, distribution, editing, or commercial use, in whole or in part, without prior written permission from OBOMEDIA is prohibited. For permissions, licensing, and business inquiries: business@obomedia.com.
adbl_web_anon_alc_button_suppression_t1
Ancora nessuna recensione