Intel Foundry Losses, China Export Controls & RTX 5090 Vanishes
Impossibile aggiungere al carrello
Puoi avere soltanto 50 titoli nel carrello per il checkout.
Riprova più tardi
Riprova più tardi
Rimozione dalla Lista desideri non riuscita.
Riprova più tardi
Non è stato possibile aggiungere il titolo alla Libreria
Per favore riprova
Non è stato possibile seguire il Podcast
Per favore riprova
Esecuzione del comando Non seguire più non riuscita
-
Letto da:
-
Di:
(00:00:25) Intel 18A Process Progress
(00:01:24) Intel AMD Stock Rotation
(00:02:09) China Tech Export Controls
(00:02:55) Nvidia RTX 5090 Supply Crisis
(00:03:32) Anthropic Nova Scotia Data Center
(00:03:58) Key Watchpoints Ahead
Intel's data centre segment surged 59% year over year to $6.3 billion — its strongest revenue growth in fifteen years. Yet the foundry unit is still deep in the red, and investors rotated out, sending Intel and AMD down 3% this week while Nvidia held steady. That divergence signals a market thesis shift: Nvidia's GPU monopoly is priced as durable, and every other chip play must now prove its economics independently. Intel's new Xeon 6+ server chips, built on the 18A process, launched ahead of internal schedule — a meaningful milestone given the company's decade-long manufacturing struggles. But process execution and foundry competitiveness are different problems. TSMC and Samsung carry a five-to-seven-year capex advantage that a faster-than-expected tape-out doesn't erase.
On the geopolitical front, China's Ministry of Commerce proposed export restrictions on 40 technologies this week, including 23 AI-related items and chip design tools. A temporary registration requirement is already live; final rules follow a consultation closing after November 15. The US has restricted advanced AI chip exports to China since 2022 — China is now building a reciprocal framework, accelerating the formation of two parallel semiconductor stacks.
Nvidia's RTX 5090 has effectively disappeared from retail, with secondary market prices reaching $8,500. A Nvidia VP confirmed production continues but supply remains constrained — language consistent with data centre and professional GPU demand absorbing available TSMC capacity ahead of consumer channels.
Finally, Anthropic signed a 20-year lease for a Nova Scotia data centre campus targeting 420 megawatts by 2028, backed by $2 billion in wind power. Power availability is fast becoming the decisive variable in AI infrastructure geography.
This episode includes AI-generated content.
adbl_web_anon_alc_button_suppression_t1
Ancora nessuna recensione