Ep. 1: Energy Costs, AI Data Centers & Why Grounding Matters More Than You Think
Impossibile aggiungere al carrello
Rimozione dalla Lista desideri non riuscita.
Non è stato possibile aggiungere il titolo alla Libreria
Non è stato possibile seguire il Podcast
Esecuzione del comando Non seguire più non riuscita
-
Letto da:
-
Di:
A proposito di questo titolo
In the first episode of Load Side, Keen Energy's John, Evan, and Alan break down why electricity costs only go one direction: up. They dig into how AI data centers are straining the grid, what that means for commercial building owners' bills, and where tax credit incentives stand heading into 2025. In Code Corner, Alan walks through three commonly missed grounding requirements in the NEC that can make or break sensitive equipment, from voltage drop upsizing to separately derived systems to radiology best practices. Plus, a look at how Meta glasses and AI could change field engineering and RFI workflows forever.
Topics: utility rate increases, AI data center power demand, solar tax credits, NEC grounding code (250.122B, 250.66), voltage drop, separately derived systems, field engineering, RFI process
Get a free energy assessment for your building: keenenergyusa.com/contact